header-element.png
Major challenges with improvements for the new system
Dato
28.01.2008

28 January 2008

Since the implementation of the new air traffic management system the 29 December 2007, we have seen a system with a very high degree of technical stability. However, we have also registered a large number of inappropriatenesses that affect the preconditions for a capacity increase.

We are working at full throttle to optimise the air traffic management system
Naviair has a good general view of the amount of bugs and desired fixes, and we approach the challenges systematically. However, we must admit that the number 

 

blok5d.jpg

of bugs and inappropriatenesses is putting ourorganisation under a lot of strain as all input from air traffic controllers must be analysed and prioritised.

These analyses and the high work load on our employees might entail that we will not be able to increase the capacity at the rate previously announced. Naviair does not compromise with flight safety.
The night between 25 and 26 January we upgraded the system with a service-patch which improves a number of the system functionalities for the air traffic controllers.

ATC Capacity and Air traffic delays
After the first four weeks of the running-in period with the new system and with traffic regulations, we find that the good cooperation we experience with the airline companies is contributing to the fact that traffic delays are more moderate than expected.

According to Naviair’s announced capacity plan in the running-in period, the airspace capacity should have been increased from 60 % to between 70 and 80 % Friday 25 January 2008. However, we have decided to await a stable result of the above mentioned service-patch, where after we expect to be able to increase the capacity – probably some time this week.


PR & Communications
+45 3247 7905

info@naviair.dk

If you need to contact Naviair, please click here
EAN 5798000893375 CVR 26059763
Naviair is ISO 9001:2015 certified

Naviair Allé 1 | DK 2770 Kastrup | Telefon: 3247 8000 | Fax: 3247 8800 | presse@naviair.dk